Philippsburg |
At the Philippsburg plant, a single subcontractor had been submitting reports based on checks he never carried out. The consequences were severe—the government has ordered a halt to EnBW’s plans to restart the unit.
At the permanently shutdown Biblis plant, a worker filed faked reports throughout 2014-15.
Our Perspective
Germany intends to shut down all its nuclear plants by 2022. Perhaps a few employees are shutting down a little early. Snark aside, maintaining a strong safety culture in the face of an anticipated shutdown (and subsequent job losses) is a significant challenge for any organization in any industry but it is especially acute in the nuclear space where the actions of a single distracted, unmotivated or alienated individual can lead to significant regulatory, political, public relations and/or physical plant problems.
* “Inspectors faked safety checks at two nuclear plants,” The Local (April 15, 2016).
** Energie Baden-Württemberg AG, a German electric utility company.